Tuesday, December 13, 2022

Scheduling a Round-Robin Tournament

Once in a while I come across a scheduling problem, and of course my first reaction is to think "integer program". A while back, for example, I used an IP model to work out a schedule for a rotating duplicate bridge game (in which both teams and hosts rotated) at the request of a buddy. Most recently, I saw a question on OR Stack Exchange ("Doubles Round Robin Sorting Algorithm") related to tournament scheduling. 

The problem involves six players playing pickleball (so two players on each team, with two sitting out, for each game). Given six players, there are 15 possible teams (pairings). Twelve games are scheduled each week for four weeks, with two sets of six games per week. The author of the question correctly computed that there are 45 possible game configurations. Over the course of the four weeks, he wanted every possible game played at least once (which leaves the final three game slots to be filled arbitrarily). The following conditions must be met:

  • within each set of six games, every player plays four games and sits out two;
  • no player sits out two consecutive games within the same set;
  • no two players are partners more than once per set.

The problem poses no criterion for selecting among feasible schedules; we just want to find any one schedule that works.

My IP formulation can be found in my answer to the OR SE question. I will just mention that it uses binary variables $x_{g,s}=1$ if game $g$ goes in slot $s$ and 0 if not. Games are enumerated up front and indexed from 1 to 15. Slots refer to positions in the schedule and are numbered from 1 to 48, with six slots per set and 12 slots per week. Since no criterion is specified, we just use the default (minimize 0).

I also tried a constraint programming model, using general integer variables $s_1,\dots,s_{48},$ where $s_j \in {1,\dots,15}$ is the index of the game played in slot $j$ of the schedule. My CP formulation uses the "all different" constraint (fairly ubiquitous among CP solvers) to ensure that the first 45 slots each contain a different game. It uses the CP Optimizer "distribute" constraint to ensure that no game is played more than twice and the CP Optimizer "count" constraint to ensure that each player plays exactly four times per set (and thus sits twice) and that no team plays more than once in a set. I'm not sure how common those types of constraints are among CP solvers because I don't have much experience with CP solvers.

As it turns out, both CPLEX (for the IP model) and CP Optimizer (for the CP model) produced feasible schedules in about a second or so on my desktop PC. My intuition was that a CP model would be better suited to this type of problem, because all variables are integer and a CP solver would not be doing much if any matrix arithmetic. As it turns out, it would take a much larger test case to tell whether that intuition has any merit.

If anyone wants to play with the models, my Java code is available from my university GitLab repository. Running it would require CPLEX and CP Optimizer (and not necessarily the most recent versions of either).

Thursday, February 10, 2022

Tournament Scheduling: CPLEX v. CP Optimizer (Part 3)

This is the third and final chapter in my opus about scheduling "pods" (players) in a tournament. Reading the first post will be essential to understanding what is going on here. Reading the second post (in which I formulate an integer programming model for the problem) is definitely optional.

I will stick with the notation introduced in the prior post. As before, there are $N$ pods (players) being organized into teams of two to play in $G$ games (two teams per game, one in white, one in black). Each game has two slots corresponding to the two teams in the game.

  • $t$ indexes a team;
  • $p$ and $q$ index pods;
  • $g$ indexes a game;
  • $s$ indexes a slot (and $s'$ is the other slot of the same game);
  • $c$ is a jersey color (0 for white, 1 for black).

For a slot $s$, I will use $G_s$ and $C_s$ to denote respectively the game in which the slot exists and the jersey color (0 or 1) of the team in the slot. For a team $t$, $P_{t,0}$ and $P_{t,1}$ will be the two pods on the team. (The order they are listed is immaterial.)

The model variables are almost (but not exactly) what they were in the IP model.

  • $x_{t}\in \lbrace 0, \dots, 2G-1\rbrace$ is the index of the slot in which team $t$ plays (where slots 0 and $G$ are the white and black teams in the first game and slots $G-1$ and $2G-1$ are the white and black teams in the final game).
  • $y_{pqg}\in \lbrace 0,1\rbrace$ is 1 if pods $p$ and $q\neq p$ are playing in game $g$ on opposing teams.
  • $z_{pg}\in \lbrace 0,1\rbrace$ is the color jersey worn by pod $p$ at the conclusion of game $g$ (regardless of whether or not $p$ played in game $g$).
  • $w_{pg}\in \lbrace 0,1\rbrace$ is 1 if pod $p$ changes jersey color going into game $g.$
  • $v_{pg} \in \lbrace 0,1\rbrace$ is 1 if pod $p$ is playing in game $g.$

The changes from the IP model are that $x$ is general integer rather than binary (with dimension 1 rather than 2), the third index of $y$ is the game rather than the slot, and $v$ is a new variable. As in the IP model, the objective is to minimize $\sum_p \sum_g w_{pg}.$

The constraints are as follows. Note that the requirement that every team play exactly once is captured by the assignment of a single slot value to each team (via $x$).

  • Two different teams cannot occupy the same slot: $$\textrm{allDiff}(x).$$
  • Occupying a slot implies playing in the game: $$x_t = s \implies (v_{P_{t,1},G_s} = 1 \wedge v_{P_{t,2},G_s} = 1) \quad \forall t,s.$$
  • Occupying a slot determines the color of the jersey worn in the game: $$x_t = s \implies  (z_{P_{t,1},G_s} = C_s \wedge z_{P_{t,2},G_s} = C_s) \quad \forall t,s.$$
  • Jersey color for a pod remains constant from game to game unless a change is recorded: $$ z_{p,g} \neq z_{p,g-1}  \iff w_{p,g} = 1 \quad \forall p, \forall g > 0.$$
  • Playing in consecutive games precludes changing jerseys: $$(v_{p,g - 1} = 1 \wedge v_{p,g} = 1) \implies w_{p,g} = 0 \quad \forall p, \forall g > 0.$$
  • Two pods are opponents if and only if they are playing in the same game with different colors: $$y_{pqg} = 1 \iff (v_{pg} = 1 \wedge v_{qg} = 1 \wedge z_{pg} \neq z_{qg} \quad \forall p, \forall q\neq p, \forall g.$$
  • Every pair of pods faces each other exactly twice: $$\sum_g y_{pqg} = 2 \quad \forall p, \forall q\neq p.$$

Here "allDiff()" is the CPLEX notation for the "all different" constraint, a global constraint common to most constraint solvers. Given a collection of variables with the same range, the all different constraint says that no two variables in the collection can take the same value.

To put it mildly, I would not be shocked if there is a more efficient (easier to solver) way to write the problem as a CP model.

 

Wednesday, February 9, 2022

Tournament Scheduling: CPLEX v. CP Optimizer (Part 2)

In my previous post, I described a tournament scheduling problem and discussed my results using both an integer programming model (CPLEX) and a constraint programming model (CP Optimizer) to try to solve it. Here I will present the IP model. (This post will be gibberish unless you have read at least the start of the previous post.)

There are multiple ways to write an integer programming (IP) model for the tournament problem. My initial instinct was to think in terms of what games a pod plays in, which pods it plays with/against and so on, but I fairly quickly changed to thinking in terms of teams rather than pods. With $N=9$ pods and two pods to a team, there are $N(N-1)/2=36$ possible teams, which we can enumerate at the outset. There will be 18 games, each containing two teams, and every team will play exactly once. Each game contains two "slots", one for the team in white jerseys and the other for the team in black jerseys.

In what follows, I will (I hope) stick to the following notation:

  • $t$ indexes a team;
  • $p$ and $q$ index pods;
  • $g$ indexes a game;
  • $s$ indexes a slot (and $s'$ is the other slot of the same game);
  • $c$ is a jersey color (0 for white, 1 for black).

Since I am using Java, all indexing is zero-based. Slots are numbered so that game 0 has slots 0 (white) and $G$ (black), game 1 has slots 1 (white) and $G+1$ (black), etc., where $G=N(N-1)/4$ is the number of games. I will denote by $T_p$ the set of teams $t$ containing pod $p$.

The model variables are as follows.

  • $x_{ts}\in \lbrace 0,1\rbrace$ is 1 if team $t$ plays in slot $s,$ 0 if not.
  • $y_{pqs}\in \lbrace 0,1\rbrace$ is 1 if pod $p$ is playing in slot $s$ and is opposed by pod $q.$
  • $z_{pg}\in \lbrace 0,1\rbrace$ is the color jersey worn by pod $p$ at the conclusion of game $g$ (regardless of whether or not $p$ played in game $g$).
  • $w_{pg}\in \lbrace 0,1\rbrace$ is 1 if pod $p$ changes jersey color going into game $g,$ 0 if not.

The objective is to minimize $\sum_p \sum_g w_{pg}.$ The constraints are the following.

  • Every team plays exactly once. $$\sum_s x_{ts} = 1 \quad\forall t.$$
  • Every schedule slot is filled exactly once. $$\sum_t x_{ts} = 1 \quad\forall s.$$
  • Pods $p$ and $q$ oppose each other with $p$ in slot $s$ if and only if $p$ is playing in $s$ and $q$ is playing in $s'$. $$y_{pqs} \le \sum_{t\in T_p} x_{ts} \quad\forall p, q\neq p, s.$$ $$y_{pqs} \le \sum_{t\in T_q} x_{ts'} \quad\forall p, q\neq p, s.$$ $$y_{pqs} \ge \sum_{t\in T_p} x_{ts} + \sum_{t\in T_q} x_{ts'} - 1 \quad\forall p, q\neq p, s.$$
  • Every pair of pods opposes each other exactly twice. $$\sum_s y_{pqs} = 2 \quad \forall p\neq q.$$
  • No pod plays consecutive games in different jerseys.$$\sum_{t\in T_p}\left( x_{t,s-1} + x_{t,s'} \right) \le 1 \quad \forall p, \forall s\notin \lbrace 0, G\rbrace.$$
  • A pod playing in a game has its jersey color determined by its team's slot. (This has the desirable side effect of preventing two teams containing the same pod from playing against each other.) $$\sum_{t\in T_p} x_{t, g+G} \le z_{pg} \le 1 - \sum_{t\in T_p} x_{t,g} \quad \forall p,g.$$(Note that for any game index $g$, slot $g$ is the white slot in game $g$ and slot $g+G$ is the black slot.)
  • A pod's color for any game (playing or not) is the same as its color for the previous game, unless a change occurs. $$z_{p, g-1} - w_{pg} \le z_{pg} \le z_{p, g-1} + w_{pg} \quad\forall p, \forall g \ge 1.$$

In the next post, I will try to articulate my CP model for the problem.

Tuesday, February 8, 2022

Tournament Scheduling: CPLEX v. CP Optimizer (Part 1)

 A recent question on Mathematics Stack Exchange asked about scheduling $N$ "pods" (players) in a tournament under the following conditions.

  • There will be $N(N-1)/4$ games played sequentially (no games in parallel).
  • Games pit teams of two pods each against each other. One team wears white and one team wears black.
  • Each pod partners with every other pod once and plays against every other pod twice.
  • No pod can play in consecutive games wearing different jersey colors.

The objective is find a schedule that minimizes the total number of times pods have to change their jersey color.

The question specifies $N=9$. Note that, since there are $N(N-1)/4$ games, a necessary condition for the problem to be feasible is that either $N$ or $N-1$ must be divisible by $4$. That condition is not, however, sufficient. An obvious counterexample is when $N=4$ and there are three games to be scheduled. The first game uses all four teams, as does the second game. Since no pod can be forced to wear different jerseys in consecutive games, all four teams would go into the second game wearing the same colors as in the first game ... which means being in the same teams, violating the rule about pods being teamed together exactly once.

I coded both an integer programming model (using CPLEX) and a constraint programming model (using CP Optimizer) in Java and tried to solve the tournament problem with $N=9$. Since everything is inherently integer and the constraints are more logical than arithmetic (the only real algebra is summing up the number of jersey changes), I had two initial expectations: that CPLEX would provide tighter lower bounds than CPO (because MIP models tend to do better with bounds than CP models); and that CPO would find feasible (and possibly optimal) schedules faster than CPLEX would, since the problem is inherently logic-based (and CP models often do better than MIP models on scheduling problems). I was half right. CPLEX did provide tighter lower bounds than CPO, at least within the time limits I was willing to use, although I don't think either came remotely close to a "tight" lower bound. CPO, however, struggled massively to find feasible schedules while CPLEX did not have too much trouble doing so.

Before going any further, I need to issue three caveats. First, the longest I ran the IP model was 30 minutes and the longest I ran the CP model was an hour. Second, while I am pretty familiar with formulating IP models, I am much less familiar running CP models, so I may have missed opportunities to make the CP model more efficient. Third, while CPLEX gives the user a fair amount of indirect control over the search process (by setting branching priorities, MIP emphasis, how frequently to try certain kinds of cuts and so on), CP Optimizer may offer the user even more flexibility in how to tailor searches I am not yet familiar enough to do anything beyond trying to indicate which variables should be the first candidates for branching (and I'm not sure I got that right).

I'll end this installment with a synopsis of some runs.

  • In a 30 minute run using the new setting 5 for the MIP emphasis parameter (stressing use of heuristics to improve the incumbent, at the cost of not paying too much attention to the lower bound), CPLEX found a feasible schedule with 14 jersey changes and a lower bound of 2.97 (a 79% gap). It evaluated somewhere around 18,500 nodes.
  • In a 30 minute run, CP Optimizer branched over 957 million times but never found a feasible schedule and ended with a best bound of 0.
  • Finally, I tried running CPLEX for three minutes (in which it found an incumbent with 19 jersey changes) and then used that incumbent as a starting solution for a one hour run of CP Optimizer. CPO accepted the incumbent solution, did a bit over 1.55 billion branch operations, and failed to improve on it. The best bound was again 0. 

If you want to look at my code (which will make slightly more sense after my next couple of posts, where I will describe the models), it is available from my university GitLab repository.

Saturday, August 25, 2018

Adding Items to a Sequence

A question posed on OR-Exchange in 2017 asked the following: Given a tour of nodes, how does one best add two new nodes while respecting the ordering of the original tour. Specifically, the author began with a tour 0 - 1 - 2 - 4 - 6 - 0 (where node 0 is a depot) and wanted to add new stops 3 and 5 in such away that, in the revised tour, stop 1 still came before stop 2, stop 2 before stop 4, etc.

This problem can arise not just in vehicle routing but in many sorts of sequencing problems (such as scheduling jobs for production). Of course, preserving the original ordering to the extent possible is not always a concern, but it might be if, for instance, the existing stops are customers who have been promised somewhat general time windows for delivery. In any event, we'll just take the question as a given.

The answer I posted on OR-X made the somewhat charitable (and, in hindsight, unwarranted) assumption that the two new stops would be inserted by breaking two previous arcs, rather than consecutively (for instance, ... - 2 - 3 - 5 - 4 - ...). So I'll post an answer without that assumption here. In fact, I'll post three variants, one specific to the case of adding exactly two stops and the other two more general.

First, let me articulate some common elements. I'll denote the set of original nodes by $N_1$, the set of nodes to be added by $N_2$, and their union by $N=N_1 \cup N_2$. All three approaches will involve setting up integer programming models that will look for the most part like familiar routing models. So we will have binary variables $x_{ij}$ that will take the value 1 if $j$ immediately follows $i$ in the new tour. We will have constraints ensuring that every node is entered and exited exactly once:$$\sum_{j\in N} x_{ij} = 1\quad \forall i\in N\\ \sum_{i \in N} x_{ij} = 1 \quad\forall j\in N.$$The objective function will be some linear combination of the variables (sum of distances covered, sum of travel times, ...), which I will not worry about here, since it is no different from any sequencing model.

The first new wrinkle is that we do not define a variable for every pair of nodes. We create $x_{ij}$ only for the following combinations of subscripts: \begin{align*} i & \in N_{2},j\in N_{2},i\neq j\\ i & \in N_{1},j\in N_{2}\\ i & \in N_{2},j\in N_{1}\\ i & \in N_{1},j\in N_{1},(i,j)\in T \end{align*} where $T$ is the original tour. Thus, for example, we would have $x_{24}$ but not $x_{42}$, nor $x_{26}$. The rationale is straightforward: if we add an arc between two original nodes that were not successors on the original tour, we will force an order reversal. For instance, suppose we replace the arc 2 - 4 with, say, 2 - 6. Node 4 now must appear either before node 2 or after node 6, and either way the order has not been preserved.

Version 1


The first variant makes explicit use of the fact that we have only two new nodes. We add one subtour elimination constraint, to prevent the new nodes from forming a subtour: $x_{35}+x_{53}\le 1.$ Now consider how many different ways we could insert the two new nodes. First, we could break two links in the original tour, inserting 3 in the void where the first link was and 5 in the void where the second link was. Since the original tour had five links there are $\binom{5}{2}=10$ distinct ways to do this. Similarly, we could break two links but insert 5 first and 3 later. There are again ten ways to do it. Finally, we could break one link and insert either 3 - 5 or 5 - 3 into the void. With five choices of the link to break and two possible orders, we get another ten results, for a grand total of 30 possibly new tours.

With that in mind, consider what happens if node 3 is inserted after original node $i$, breaking the link between $i$ and its original successor $j$. (In our model, this corresponds to $x_{i3}=1$.) If this is a single node insertion, then we should have $j$ follow node 3 ($x_{3j}=1$). If it is a double insertion ($i$ - 3 - 5 - $j$), we should have $x_{35}=x_{5j}=1$. We can capture that logic with a pair of constraints for each original arc:
\[ \left.\begin{aligned}x_{i3}-x_{3j} & \le x_{35}\\ x_{i3}-x_{3j} & \le x_{5j} \end{aligned} \right\} \forall(i,j)\in T. \] We could do the same using node 5 in place of node 3, but it is unnecessary. If node 3 is correctly inserted by itself, say between $i$ and $j$, and node 5 is inserted after original node $h$, then the original successor $k$ of $h$ needs a new predecessor. That predecessor cannot be $h$, nor can it be any other original node (given our reduced set of variables), nor can it be node 3 (which now precedes $j$). The only available predecessor is 5, giving us $h$ - 5 - $k$ as expected.

You might wonder how this accommodates a 5 - 3 insertion, say after node $i$. The original successor $j$ of $i$ needs a new predecessor, and 3 is the only eligible choice, so we're good.

I tested this with a small Java program, and it did in fact find all 30 valid revised tours (and no invalid ones).

Version 2


Version 2, which can be applied to scenarios with any number of new nodes, involves building a standard sequencing model with subtour elimination constraints. The only novel element is the reduced set of variables (as described above). A blog is no place to explain sequencing models in their full glory, so I'll just assume that you, the poor suffering reader, already know how.

Version 3


In version 3, we again build a sequencing model with the reduced set of variables, but this time we use the Miller-Tucker-Zemlin method of eliminating subtours rather than adding a gaggle of subtour elimination constraints. The MTZ approach generally results in smaller models (since the number of subtours, and hence the potential number of subtour constraints, grows combinatorially with the number of nodes), but also generally produces weaker relaxations.

The Wikipedia page for the TSP shows the MTZ constraints, although for some reason without labeling them as such. Assume a total of $n$ nodes (with consecutive indices), with node $0$ being the depot. The MTZ approach adds continuous variables $u_i, \,i\in \{1,\dots,n\}$ with bounds $0\le u_i \le n-1$. It also adds the following constraints for all eligible arcs $(i,j)$ with $i\neq 0$:$$u_i - u_j + n x_{ij} \le n-1.$$You can think of the $u_i$ variables as counters. The MTZ constraints say that if we go from any node $i$ (other than the depot) to any node $j$ (including the depot), the count at node $j$ has to be at least one larger than the count at node $i$. These constraints preclude any subtours, since a subtour (one starting and ending any place other than the depot) would result in the count at the first node of the subtour being larger than itself.

As I mentioned, the MTZ formulation has a somewhat weaker LP relaxation than a formulation with explicit subtour elimination constraints, so it is not favored by everyone. In our particular circumstance, however, it has an additional virtue: it gives us a relatively painless way to enforce the order preservation requirement. All we need do is insert constraints of the form$$u_j \ge u_i + 1\quad\forall (i,j)\in T.$$This forces the counts at the original nodes to increase monotonically with the original tour order, without directly impacting the counts at the new nodes.

Friday, August 15, 2014

Scheduling Instability

Fellow OR blogger Laura McLay recently wrote a post "in defense of model simplicity", which is definitely worth the read. It contains a slew of links to related material. As I read it, though, my contrarian nature had me thinking "yes ... as long as the model is not too simple".

A recent piece in the NY Times ("Working Anything but 9 to 5") had me thinking again about model simplicity. The gist of the Times article is that irregular (erratic, chaotic) work schedules for hourly employees, coupled with short notice of those schedules, creates stress for some families, particularly single-parent families where daycare needs to be arranged. Fairly deep into the article, I found someone saying what I was thinking:
Legislators and activists are now promoting proposals and laws to mitigate the scheduling problems. But those who manufacture and study scheduling software, including Mr. DeWitt of Kronos, advocate a more direct solution: for employers and managers to use the software to build in schedules with more accommodating core hours.

“The same technology could be used to create more stability and predictability,” said Zeynep Ton, a professor at M.I.T. who studies retail operations.
The multiperiod nature of scheduling models tends to make them a bit chewy, especially when you need to coordinate schedules of multiple individuals (or machines, or venues) across blocks of time while dealing with multiple constraints and possibly multiple conflicting criteria. As with most discrete optimization problems, simplicity of the model tends to pay dividends in reduced execution time. That said, models that take into account the cumulative schedules of workers do exist. In the U.S., the Federal Aviation Administration has rules limiting consecutive hours in the cockpit and rest times for pilots flying passenger routes. (If you think this is another example of the "nanny state", have a look at this article about an Indian airliner imitating a roller coaster.)

There are at least four dimensions in play that may be contributing to the high variance in schedules for some employees:
  1. Is the employer concerned enough about scheduling chaos to make it a policy to mitigate variance in schedules of individual employees?
  2. If so, is the policy being implemented?
  3. How does the employer assess tradeoffs between smoothing of schedules and other criteria (adequate staffing, staffing cost, matching staff skills with needs, ...)?
  4. Can/does the scheduling software (assuming software is used) implement variance-mitigation either as constraints or in the objective function?
The second dimension, in my opinion, is one best left to the management folks (my erstwhile colleagues). The fourth dimension clearly belongs to the OR crowd: we need to make provision for those sorts of constraints/criteria, even at the risk of making models more complicated (cough Laura cough),  and we need to communicate clearly to the users that those provisions exist (and how to use them). I'm inclined to think that the first and third dimensions straddle the disciplines of OR (or, if you prefer, analytics) and management. The management folks can provide evidence-based arguments of how more worker-friendly schedules can improve employee performance and retention, while those of us in OR can perhaps help assess the trade-offs and quantify costs and benefits.

[Update: Starbucks, at least, appears to be implementing policy changes. Thanks to Tallys Yunes for this link: "Starbucks to Change Scheduling as Some Employees Struggle".]

I'll conclude with a wonderful anecdote, told to me long ago by a colleague from our statistics department, about model simplicity. He attended a colloquium by what would now be called a biomathematician (I don't think the category existed back then). The presenter had developed a model for arterial blood flow in the human body, using a system of nonlinear differential equations. The right-hand sides of the equations represented a forcing function. The system was too complex for the presenter to solve, so he simplified things by solving the homogeneous case (setting the right sides of the equations to zero). At the conclusion of the talk, after the usual round of applause, the presenter asked if there were any questions. He got at least one: "If the forcing terms are all zero, doesn't that mean the patient is dead?" It does -- the simpler model that he had solved required that the body's heart not beat.

Simplicity in models is good, but arguably not worth dying for.